Scope of Work

Contractor: Royal Electric
Location: Oakland Airport, CA
Project Scope: Hydraulic Core Drilling
Description: Our team was brought on to assist Royal Electric in drilling out old runway lights and drill holes for new ones on the runway at Oakland Airport. Our team utilized a skid steer with a hydraulic core drill mounted to a plate to core drill 90 holes. Cores were both 30” diameter and 36” diameter and the depth of the runway was 24” thick. Our team had crews running both day and night on this project to meet project schedule demands. Anytime you are working on an air field, time and cleanliness are paramount. Our team was able to meet both of those demands on this project and we did so with no mechanical break downs or spills on the runways.